28 August 2003 

Present:   STH, JRL, DWE

Apologies::   MJI, PSB, JMI

Agenda
------

1. Actions from last meeting
2. Comments on WFAU minutes
3. Progress for monthly report
4. Comments on JMI reports prior to release:
			a) Difference imaging
            	        b) Simulations
			c) DQC info
        (wfcam internal www pages/diary page)
5. Discussion of On-Sky Characterization
        (http://www.jach.hawaii.edu/JACpublic/UKIRT/instruments/
         wfcam/commissioning/)
6. ESO docs and VISTA fits headers
	(http://www.ast.cam.ac.uk/~wfcam/internal/pete/did/VISTA.FITS)
7. AOB

Minutes
-------

1. Actions from last meeting

STH  has received data from Sandy Legget. Unfortunately the two scheduled
     nights were clouded over and a previous night of data was sent to STH.
     This is regarded as a start. STH will check the data and (probably)
     send in a request for more data.                                      <<<<

STH  corrected an error in the yearly totals for the WP spreadsheet. He
     pointed out that the PS and PDF versions had not been updated yet. It was
     agreed that in addition to the XLS version only a PDF version will be
     supplied in future.

MJI  have made progress with the pipeline milestones tasks and dates. It still
JRL  needs some work on dates before it can be released on the web page    <<<<

MJI  has made no progress regarding finding out about the UKIDSS Survey 
     Manager appointment on Hawaii. This will await AA's return from
     holiday.                                                              <<<<

MJI  has started updating Section 2. of DFS user requirements document.
     This action is ongoing.                                               <<<<

JRL  placed V0.6 of FITS header document on docs web page - now awaiting ROE
     progress on this.
     
PSB  updated the DFS docs
     
JMI  updated simulation report and has placed on the internal web pages. 
+ALL Comments from rest of CASU group are still expected before the document
     goes public. These should be sent to JMI by Monday afternoon. 
     This also applies to the image subtraction and DQC document           <<<<
     
MJI  has sent JRL the latest version of imcore_wfcam
     
MJI  contacted Mark Casali regarding the engineering data status. He is
     awaiting a reply. [Received following reply shortly after the meeting
     included here for ease of reference]

     "No, no new data - we've had problems with the detectors - damage due to
     thermal cycling. We've been working with a specialist from Rockwell here
     for the last week trying to find the problem...hope to be testing again
     soon, but we clearly have substantial verification to do before we are
     confident enough to test another detector."


2. Comments on WFAU minutes

It was noted that the LT01 vs LT02 compatibility tests have been carried out
successfully at ROE.


3. Progress for monthly report

STH noted that he wanted the monthly reports in by Friday afternoon (Monday
at the latest) based on the deliverables for the quarter and updating 
the 03Q3m1 document.                                                       <<<<

DWE said that he had been in contact with Emmanuel Bertin and has now got
SWarp working with fractional pixel shifts as expected.


4. Comments on JMI reports prior to release:
     (a) Difference imaging (b) Simulations (c) DQC info

As mentioned previously, further comments on these to JMI as soon as
possible and by Monday afternoon at latest. MJI has already handed in his
comments.                                                                 

STH said that one of the things needed in (a) is more of an introduction.
For example, what is adaptive kernel matching? This should be short, but
something is needed by readers that know little about this subject. What is
image subtraction used for ?  [Added by MJI after - MJI disagreed somewhat, 
commenting the report is not meant to be a standalone review but rather a 
a comparison of different image subtraction techniques.  However, he will 
add a brief introduction plus references setting the context before placing 
it on the public web page.]                                                <<<<

Also it was felt that (a) needed a conclusions and a summary section. This
is related to previous comments that it was difficult to quantify how good
a difference imaging algorithm was performing. Considering how the results
would be used by the users might be a reasonable way of looking at this.
[Added by MJI after - this comes later in phase II of the work and the 
report.  The current document is interim (Phase I) but should be released 
for external comment now].

Report (b) was considered by STH to be ready for release soon (before
monthly meeting).

In general, both (a) and (b) required a little more concerning context ie.
why are we doing this? what will the results be used for? what are the
requirements? etc.                                                         <<<<

Document (c) is a demonstration of DQC and pipeline progress monitoring
rather than a report.   Although none are in final form, since these are 
all working documents they should all be released on the public side of 
the web page before the MC meeting for feedback.                           <<<<


5. Discussion of On-Sky Characterization

JRL commented that the persistence part of the characterization did not deal
with the spreading of the image. Persistence has a spatial as well as a
temporal part that needs to be quantified.

STH was concerned about the setting up of the photometric standard fields.
It didn't seem to be very prominent. This needs to be included in the WFCAM
timeline and clarified within the characterization plan. STH needs to email
Paul Hirst or Andy Adamson.                                                <<<<

MJI had sent in some comments that were similar to STH's.


6. ESO docs and VISTA fits headers

JRL said that he had looked at the headers document. He will send in his
comments to PSB.                                                           <<<<

DWE raised the issue about the requirement to have the EQUINOX keyword in
the FITS header. It was pointed out that if the keyword RADECSYS is "ICRS"
then equinox has no meaning ie. the ICRS is not linked to the Earth's pole.
By leaving it in you run the risk of confusion.  MJI pointed out that by
removing it you run the risk of most packages not working.

Concerning the ESO documents, in the DID the FITS headers description has
been written, CalDoc has been updated and there is no change in the User
Requirements Document. We all should have a read of these and provide
comments for PSB.                                                          <<<<

When JRL is at ADASS he will talk to ESO attendees regarding CPL.


7. AOB

JRL said that he had been in touch with Paul Aslin concerning the renewal of
our contracts. It would seem that since our contracts only need renewal in
October, the University has put the work on hold since it needs to sort out
their September contracts first.


Continuing Actions
------------------

STH  check Sandy Legget's data and (probably) send in a request for more 
     data.

MJI  finalize and release the pipeline milestones tasks and dates.
JRL  

MJI  await reply from AA concerning the UKIDSS Survey Manager appointment on 
     Hawaii.

MJI  continue updating Section 2. of DFS user requirements document.

JMI  Send comments regarding JMI's three reports to him by Monday afternoon 
+ALL (or sooner). [simulations, image subtraction and DQC]


New Actions
-----------

ALL  send monthly reports to STH by Friday afternoon (Monday at the latest)

MJI  write intro for difference imaging report by Monday afternoon

STH  write context intro for simulation report by Monday afternoon

JMI  incorporate feedback, update documents and link from public web page

STH  email Paul Hirst or Andy Adamson concerning the the setting up of the 
     photometric standards fields within the characterization plan.

JRL  send comments to PSB about the FITS headers document. 

ALL  read ESO documents and provide comments for PSB.